Public deliverables will be made accessible through this area as they are approved and released.
Only deliverables marked Public should be posted openly. Sensitive deliverables should remain in the protected project environment.
| ID | Deliverable | WP | Lead | Due | Level |
|---|---|---|---|---|---|
| D1.1 | Comprehensive overview of the project | WP1 | RINA-CSM | M6 | Public |
| D1.2 | Public publishable report | WP1 | RINA-CSM | M42 | Public |
| D1.3 | Risk and Contingency Plan | WP1 | RINA-CSM | M6 / M18 / M36 | Sensitive |
| D1.4 | Data Management Plan | WP1 | RINA-CSM | M6 / M18 | Public |
| D2.1 | Industrial scenarios and SHINE Use Cases, including requirements and KPIs | WP2 | ADI | M3 | Public |
| D2.2 | Small-scale plant model refinement and finalisation | WP2 | PIT | M6 | Sensitive |
| D2.3 | Small-scale plant test plan | WP2 | PIT | M6 | Sensitive |
| D3.1 | Tests on small-scale pilot plant to support industrial demonstrator design | WP3 | RINA-CSM | M12 | Sensitive |
| D3.2 | Final report on small-scale tests | WP3 | RINA-CSM | M18 | Sensitive |
| D3.3 | Methodological approach and experimental evaluation of refractory materials | WP3 | RINA-CSM | M21 | Sensitive |
| D3.4 | Integrated FEM-based modelling report for electric heater design | WP3 | UPM | M18 | Public |
| D3.5 | CFD and refractory lining performance modelling report | WP3 | UPM | M21 | Public |
| D3.6 | Carbon avoidance evaluation model | WP3 | ADI | M21 | Sensitive |
| D4.1 | Executive design of industrial-scale pilot plant | WP4 | PIT | M18 | Sensitive |
| D4.2 | Industrial-scale demonstrator | WP4 | Stegra | M30 | Sensitive |
| D5.1 | Test Validation Plan | WP5 | Stegra | M30 | Public |
| D5.2 | Digital Twin for predictive control and performance forecast | WP5 | UPM | M36 | Sensitive |
| D5.3 | Demonstration and validation of SHINE solutions | WP5 | Stegra | M42 | Sensitive |
| D5.4 | Result analysis and lessons learnt | WP5 | PIT | M45 | Sensitive |
| D5.5 | Replicability analysis | WP5 | ADI | M45 | Public |
| D6.1 | Market analysis and preliminary exploitation plan | WP6 | RINA-CSM | M30 | Sensitive |
| D6.2 | Final exploitation plan and Business Model | WP6 | RINA-CSM | M45 | Sensitive |
| D6.3 | Techno-economic assessment for other applications | WP6 | ADI | M48 | Sensitive |
| D6.4 | LCA, LCC and Carbon Footprint Report | WP6 | RINA-CSM | M48 | Sensitive |
| D7.1 | Dissemination and Communication Plan | WP7 | UPM | M6 / M24 / M36 | Public |
| D7.2 | Project Website | WP7 | UPM | M4 | Public |
| D7.3 | Stakeholder engagement, networking activities and clustering | WP7 | RINA-CSM | M48 | Public |
| D7.4 | Skill-gap analysis and training programme | WP7 | RINA-CSM | M48 | Public |