WP5 — Demo plant trials and validation | SHINE
Work Packages

WP5 — Demo plant trials and validation

Lead: Stegra. Duration: M25–M45.

WP1ManageWP2ScenariosWP3Pilot + modelsWP4BuildWP5ValidateWP6ImpactWP7Disseminate
SHINE work-package sequence; the highlighted block indicates this page.

Objectives

  • Validate SHINE under industrial conditions
  • Develop a real-time Digital Twin
  • Analyse long-duration performance and refractory behaviour
  • Assess transfer to additional applications

Core tasks

TaskActivity
T5.1Definition of demo plant test campaign
T5.2Digital Twin development for predictive control and performance forecasting
T5.3Validation of demo plant
T5.4Post-exposure refractory characterisation
T5.5Result analysis and lessons learnt
T5.6Replicability studies in other steel applications
UPM leads the Digital Twin activity and D5.2, while Stegra leads industrial validation.

← Previous WP   Next WP →

Scroll to Top